Committed to Client Satisfaction’

ALTA Surveys

Name:

Address:

Phone #:

E-mail:

Company:

Do You have a Title Report available?

 Yes

Monuments at major corners of the boundary

Assessor Parcel Number :

(APN)

Adkan Engineers can prepare an ALTA Survey of your property, normally, within 15 days of receipt of the property title report.  In order to expedite service to you, please fill out the information below.  Information such as the property legal description, title report, grant deeds or Assessor Parcel Maps can be emailed directly to  gedwards@adkan.com, our supervising Office Surveyor.

Please add in the box below any additional information that you feel may be helpful to us.

To contact us:

We are located in Riverside California

6820 Airport Drive

Riverside, CA 92504

 

Phone: 951.688.0241

Fax: 951.688.0599

E-mail: mail@adkan.com

 

 

What is the size of the property?

Below is a list of optional responsibilities of the ALTA/ACSM survey (1999 standards) (Table “A”).  It  includes a list of items that may be included on your survey if you request them. Please check ’yes’ in the box next to those ’optional’ items that you wish us to include in this proposal.   

                         

Type of Certification?

 Lender

 Legal/Attorney

Don’t Know

Type of Property?

 Vacant

 Commercial

Industrial

Retail

Multi-Family Residential

Single Family Residential

 Yes

Vicinity map in reference to nearby highway (s) or streets

 Yes

Flood Zone designation

 Yes

Gross land area (and others if specified by client)

 Yes

Contours and datum of the elevations

 Yes

Gross land area (and others if specified by client)

 Yes

Zoning or building setbacks

 Yes

Exterior dimensions of all buildings at ground level

 Yes

Square footage of:

Exterior footprint of all buildings at ground level

 Yes

Other areas to be defined by client

 Yes

Measured height of all buildings

 Yes

Substantial visible improvements

 Yes

Parking areas, striping and type

 Yes

Indication of access to a public way on land

 Yes

Location of utilities as determined by:

Observed evidence

 Yes

Observed evidence together with data from existing plans collected from utility purveyors, local agencies etc.

 Yes

Governmental Agency survey-related requirements as specified by the client

 Yes

Names of adjoining owners of platted lands

 Yes

The distance to the nearest intersecting street

 Yes

Rectified orthophotography, photogrammetric mapping

 Yes

Evidence of earthwork and/or construction

 Yes

Completed or proposed changes in the street right-of-way

 Yes

Evidence of a solid waste dump, sump or sanitary landfill

 Yes

Other requested items:

 Yes

to view a complete (detailed) version of Table “A” Optional Survey Responsibilities.